MCA
MCA enables SPI Administrators the ability to simulate an upcoming SPI Owner Operator merge, and or claim activity resulting in an in depth understanding of the impact (before it happens). MCA provides awareness and best practice recommendations in order to maintain high data integrity, avoiding data loss or corruption.
Identify revision archives that are incorrectly linked to specific revisions, or revision archive links that are broken and are no longer available to the end user to view.
Close out greenfield projects by using a module within MCA porting the data into the As-Built section within minutes.
Key benefits: Communicates the simulated impact in easy to understand business terms. The recommendations, and risk reduction steps result in the data being protected. Close out Greenfield projects within minutes.
Download the Beaconsuite MCA Product Sheet (PDF)
Benefits
- Ensure field employees have accurate information
- Improve on-site safety by reducing concurrent engineering
- Protect your data integrity from high risk, duplicate and missing data
- Quantify the cost and time to close open projects
- Improve efficiency by identifying low risk projects for close out
Features
- Quickly and effective report all Owner and Operator projects
- Display number of active and inactive projects, tags and data complexity
- Identify projects that share data
- Identify deleted and renamed As-Built Data
- Identify assets being used in other projects
